Rice Mill Machinery & Turnkey Projects
Pre-engineered buildings provide exceptional design flexibility and significantly reduced construc tion time, from initial design to completion. Supplied as a complete package, including steel struc ture, building accessories, and roof cladding, these buildings require no on-site fabrication or weld ing, as they are easily assembled through bolted connections according to specification.
PRIMARY FRAME SYSTEM
The primary frame system consists of the key structural components of a Pre-Engineered Building (PEB), including columns, rafters, crane beams, mezzanine beams, and other supporting elements. These components are fabricated from high-strength steel plates using advanced manufacturing technologies
SECONDARY FRAME SYSTEM
Purlins, girts, eave struts, anchor bolts, and race rods are secondary structural members used to support roof and wall panels. Purlins are typically installed on the roof, while girts are used on the walls for structural integrity